VERIFICATION: THE VERIFY THE PROCESS LIKE SET OF DOCUMENTS,PLANS,SPECIFICATIONS AND REQUIREMENTS.

VALIDATION: THE ACTUAL TESTING OF AN ACTUAL PRODUCT.

Verification all the documents produced during development, and on plans.
i/p for verification:
1 Checklists
2. Issue lists
3.Walk throughs
4. Inspections
5. Reviews and Meetings

Validation is actual testing
i/p for validation:
1. Test Cases based on user requirements.
2. Test Data etc.

0 comments