QUIZ
Q1: In which areas OAT concentrate?
Q2: CDRM stands for?
Q3: List the mitigation methods for OAT Phase?
Q4: Complete the sentence:
The Project Manager and the Test Manager are required to provide CDRM input and analyze CDRM output during the ………………………..in the project lifecycle.
Q5: List down the types of System Testing?
Q6: Which testing proves the system both controls its users' access and is secure from hacking?
Q7: Which method ensures a common understanding of requirements and processes between the Business, Operations and Development?
Q8: Which method is used to prove that the infrastructure has been designed to cope with unplanned outages?
Q9: What are the key deliverables of development lifecycle in CDRM framework?
Q10: Unit testing tests ensure the ………………………….


Answers

Ans1: OAT concentrates on areas such as resiliency, recoverability, integrity, manageability and supportability, with the specific exclusions of Performance, Security and Disaster Recovery, which are areas of speciality in their own right
Ans2: Change Driven Risk Management
Ans3: The following mitigation methods form the OAT phase:
•        Backup & Recovery
•        Change Implementation
•        Change Back-out
•        Component Failure
•        Shutdown & Resumption
•        Operational Support & Procedure
•        Alerts
Ans4: Commence stage in the project lifecycle.
Ans5: Functional Testing, Accessibility Testing, Usability Testing, Performance Testing and Security Testing.
Ans6: Security Testing
Ans7: Testing during Analysis
Ans8: Component Failure
Ans9: Requirements Specification, the Application Design and the Component Designs.
Ans10:  individual parts of the solution deliver their independent designs.

2 comments
  1. Softwares info.... April 15, 2010 at 11:22 PM  

    good one

  2. VIKAS November 2, 2010 at 12:22 AM  

    thanks...